
Turn wet cuttings into drier waste and recovered mud, right on the lease. A portable, standalone system for oil- and synthetic-based mud programs.
Request a free field assessmentRecoverTank runs after the shale shakers and fits into your existing solids-control setup. It's independent of the active mud system, and a cuttings bypass sends cuttings straight to the shale bin whenever needed, so drilling can continue during service.




Results vary with operator stabilization practice, mix-off and weather.
| Unit size | 408 in L × 126 in W (10.4 m × 3.2 m) |
| Weight | 22,500 kg (49,604 lb) |
| System layout | 40 × 24 ft (unit, shale bin and auger) |
| Unit width | 10'6" |
| Penetration rate | Peaks of 220+ m/hr in 311 mm hole |
| Rig-up | Rig-up in a few hours |
| Position | After the shale shakers, independent of the active mud system |
| Bypass | Bypassable; drilling continues during equipment service |
| Fluids | OBM / SBM |
| Liquid additives | 100% recovered, returned to your active system ready to reuse |
| Fluid measurement | Digital + analog meters |
Specs per RT2 spec sheet (rev. 2022).
ROC varies with shaker configuration, lithology and fluid type. We measure it on your well. Request a free field assessment →

Proven on the toughest wells in Western Canada.
Tell us about your next program. At no cost, we'll estimate how much fluid you can recover and what it's worth.
Request a free field assessmentGive us a call · 403-451-0133